- TypeBusiness
- Location Berlin, Germany
- Date 06-03-2023 - 07-03-2023
Engineering
Business Development
OTHERS
Global wind turbine operation and maintenance forum 6-7 march 2023
Description
Every year from now, up to 20,000 turbines around the world will be entering the second half of their 20-year design life, already having long since fallen out of standard manufacturer warranties. The turbines now increasingly attracting the attention of O&M technicians are bigger, heavier, taller and much more complex than their predecessors. The rise in installations from 2009 was accompanied by significant shifts upwards in nameplate capacity, tower heights, rotor-blade lengths and operating reliability. This enabled wind development at sites previously considered economically unviable on the grounds of, among other things, low wind speeds and extreme temperatures, remote and hard-to-access locations, hilly and forested terrains.
During this event we’ll cover
SI NO | Filename | Download |
---|---|---|
1 | Agenda | Download |